What's happened
SciDev's Maxiflox® chemistry has received a trial order for the Las Bambas copper mine, which produces ~400,000 tonnes of copper per annum and has an expected mine life of 20 years. SciDev’s MaxiFlox® chemistries will be utilised to improve water recovery and increase the available volume in the mines tailings storage facility.
How this trial came about
This commercial trial is the result of earlier successful technical evaluations that SciDev conducted during CY2019.